Thursday, April 3, 2014

365 Photos Day 92/ C is for




Nice design. However, it is a leak from before I had the roof redone. Kilz is in order to cover it then a paint job. There are two spots.
This is the other spot. I will get things taken done and it will be the last major inside thing to do in the house. I have the paint for the ceiling. I need to get the rollers and something to cover the floor. I'm ready.

TTFN

4 comments:

  1. Yes, it is a nice design...'Ceiling Bloom's. Perhaps you should frame it and sign it to display as 'LookUpscaleWallArt'. At least until you get the Kilz. Very inventive for Letter 'C'. Love It.
    Sue at CollectInTexas Gal

    ReplyDelete
    Replies
    1. I'm doing some inside things so we can put it on the market, Sue. So I will see if I can come up with more. LOL.

      Delete
  2. We had a leaky roof this winter and have a big black patch on our bedroom ceiling. Must do something about it!

    ReplyDelete
    Replies
    1. If it is black, it would indicate mold. I recommend bleaching it first, then Kilz, and finally paint. Then find the leak. Best of luck

      Delete

October Already

 I'm not sure where the time has flown. June was an exiting month. July was a mess. I had a change of medication which caused me to gain...